Model | AIN49176171 |
Nominal Voltage | 3.2V |
Capacity | Max: 120Ah Min : 119Ah |
Charging Current | Standard Charging: 0.2C Max. Charging: 1C |
Max. Discharging Rate | Max. Continuous Discharging: 1C Max. Peak Discharging: 3C |
Cut-off Voltage | Charging: 3.65V Discharging: 2.5V |
Internal Resistance | ≤ 0.5mΩ (At 0.2C rate, 2.0V cut-off) |
Dimensions | 49*176*171mm |
Working Temperature | Charging: -10℃~45℃ Discharging: -20℃~60℃ |
Storage Temperature | ≤1month: -10–45℃ ≤3month: 0–30℃ ≤6month: 20±5℃ |
Life Cycle | >2000 times (80% of initial capacity at 0.2C rate, IEC Standard) |
1.Applicable battery protection board must be installed;
2.Protection board must be wiring correctly lest battery internal malfunction;
3.Over charge or over discharge must be avoided for it will result in battery damage;
4.Apply the specified charger and the recommended charge methods under appropriate surroundings.
5.Short circuit connection for polarity by metal or wire is forbidden in any case.
6.Handle with care for the battery and no crash ,falling down or trampling.
Shipping:
for details please kindly contact,thank you very much!
1.Shipping Cost:
Select the quantity first, then click the country via logistic methods in the page.And the actural express will be FedEX or UPS.
Go the the next page, you can see the detail shipping cost by each logistic methods under your selection.
2.Shipping method:
A.Air transportation+express delivery ( FedEX/UPS/TNT or your local express,only this second voyage can be tracked):
the trade terms for this method is DDP (includes customs clearance,duties,door to door),its applicable for most of Asia
countries,America,parts of Europe,UAE and canada. While Australia,Switzerland,Singapore,Taiwan,India,Malaysia,New Zealand are
DAP(door to door,no customs duties).
B.Express :
Whole-process logistics tracking;
Faster delivery (7~10 days);
Exclusive of customs duties;
C.Sea transportation for great quantity,with longer ETA (25~35 days),but save your shipping cost.
3. Item Processing Time: The processing time for a specific order varies with the product type and stock status. Mostly, ETD:6 ~ 8
days;
ETA:7~10 days for DAP;
ETA: 12~16 days for DDP.
ETA: 25~35 days for sea transportation.