Model | AIN-LFP 5000 | AIN-LFP 2400 | AIN-LFP 2500 | AIN-LFP 2600HV |
Total energy(DC) | 5.1kWh | 2.4kWh | 2.5kWh | 2.56kWh |
Usable energy(DC) | 4.6kWh | 2.2kWh | 2.2kWh | 2.2kWh |
Norminal dis-/charge power | 3.0kw | 2.75kw | 3.75kw | 4.6kw |
Peak power(only discharge) | 6kw for 3s | 3kw for 3s | 3kw for 3s | 3kw for 3s |
Constant current(only discharge) | 80A | 40A | 40A | 20A |
Voltage | 48-56Vdc | 48-56Vdc | 48-56Vdc | 96-112Vdc |
Norminal voltage | 51.2Vdc | 51.2Vdc | 51.2Vdc | 102.4Vdc |
Norminal current | 60A | 30A | 30A | 15A |
Max.charge voltage | 57.6Vdc | 57.6Vdc | 57.6Vdc | 115.2Vdc |
Weight | 45kg | 27.5kg | 23kg | 24kg |
Dimension(mm) | 500*442*135mm | 500*442*133mm | 500*442*88mm | 500*442*88mm |
Max.recommended DOD | 90% | |||
Operating condition | Indoor | |||
Operating temperature | 0--45 deg (charge); -10-- 50 deg (discharge) | |||
WIFI frequency range | 2400MHz--2483MHz | |||
Humidity | <60%(No condensed water) | |||
Pollution degree | 3 | |||
Over voltage category | II | |||
Cooling type | Natural cooling | |||
Case material | Metal | |||
Color | Black or White | |||
Installation | Wall mounting/Ground Installation | |||
IP rating | IP20 | |||
Protective class | I | |||
Max.numbers of parallel or series | 8S/4P | 8S/8P | 8S/8P | 6S |
Warranty | 10years | |||
Life span | >15years | |||
Communication | CAN/RS485 | |||
Protection mode | Dual hardware protection | |||
Battery protection | Over-current/Over-voltage/Short circuit/Under voltage/Over temperature | |||
Safety | CE TUV | |||
Hazardous material classification | 9 | |||
Transportation | UN38.3 |
The Energy Storage battery has following advantages
1.Assemblly freely in series or parallel: up to 8S8P(448V326.4kWh)
![]() | Optimized self-consumption will be achieved. Batteries are used to store the excess energy produced by PV systerm |
![]() | Extra energy will be fed into the grid when batteries are fully charged and system has already met its self consumption requirement. |
![]() | Batteries will power the AC load when the sun sets. |
![]() | If the battery capacity is insufficient to meet self consumption, electricity will be obtained from the grid. |








Payment Terms | T/T | EXW | 30% in advance for deposit payment, the balance payments will be paid before shipment. | |
FOB | ||||
CFR/C&F | 30% in advance for deposit payment, the balance will be paid against copy of B/L | |||
CIF | ||||
L/C | For the amount of one shipment above 50,000 usd, L/C at sight is acceptable. | |||
West Union | For the amount less than 5000 usd | |||
Paypal | ||||
Delivery Time | 7~25 days after receiving the payment or the deposit payment |
100% Products quality protection

